The Middelgrunden Offshore Wind Farm. A Popular Initiative.
2003
Download : PDF (1,5 MiB)
Resumo :
The idea of the Middelgrunden wind project was born in a group of visionary people in Copenhagen already in 1993. However it took seven years and a lot of work before the first cooperatively owned offshore wind farm became a reality. Today the 40 MW wind farm with twenty modern 2 MW wind turbines developed by the Middelgrunden Wind Turbine Cooperative and Copenhagen Energy Wind is
producing electricity for more than 40,000 households in Copenhagen.
Veja também
-
Cahier d’Initiatives. Annexe au document d’orientation des Rencontres du Mont Blanc 2011
Louis Favreau, Mario Hébert, novembro 2011